I was told that it would be towards the end of April before things begin to get moving with it, suppose their is a lot to sort out now with 20+ people.
I hope that it would be 40% but i think 35% is more likely but that is still a huge saving.
I think that i'll probably get mine fitted at lohen, ive been searching for instructions too but nothing found. I thought im making a huge saving, whats another couple of quid to get it sorted out. Plus i can drive back down the road with it on.
This is going to be the longest 3 weeks now! |